
Wuhan Liangzi Lake Photovoltaic Project
1. Prefabricated buildings are not the construction method with the shortest construction period, because the prefabrication time and communication costs also need to be included in the total construction period. When the owner's own engineering management ability is weak, this construction period is often difficult to control.
- Information
The infrastructure of such project sites is generally weak, and the conditions for material transportation even require people to carry it on their shoulders, so the weight of a single piece of material should be controlled. In short, the cold-bent thin-walled steel system is a good choice.
Get the latest price? We'll respond as soon as possible(within 12 hours)